SSC CGL / CHSL / MTS - MCQ Practice Questions
Practice <strong>SSC CGL Tier-1 & Tier-2</strong> MCQ questions covering Quantitative Aptitude, English Language, General Intelligence & Reasoning, and General Awareness. Aligned with the latest SSC exam pattern — perfect for Inspector, Auditor, Assistant, and other Group B/C aspirants.
424 questions | 100% Free
A mixture contains 60% alcohol. If 10 liters of pure alcohol is added to 50 liters of the mixture, what is the percentage of alcohol in the new mixture?
Two pipes can fill a tank in 8 and 10 hours respectively. A drain pipe can empty it in 12 hours. If all three are opened together, how long will it take to fill the tank?
A can do a piece of work in 15 days and B can do it in 10 days. How long will they take together?
A vessel contains milk and water in the ratio 7:3. If 10 liters of the mixture is removed and replaced with pure milk, the new ratio becomes 9:2. What is the original quantity of milk?
The sum of three consecutive even numbers is 84. What is the largest number?
If a² + b² = 13 and ab = 6, what is the value of (a + b)²?
A person deposits Rs. 5000 in a bank at 6% per annum for 3 years at compound interest. What is the compound interest earned?
A and B together can do a work in 12 days. B and C together can do it in 15 days. A and C together can do it in 20 days. How long will A alone take to complete the work?
A vessel contains 80 liters of milk. From this, 8 liters is removed and replaced with water. This process is repeated two more times. What is the quantity of milk left in the vessel?
If 2^(x-1) = 8, what is the value of x?
A man bought two items for Rs. 1000 and Rs. 1500. He sold the first at 20% profit and the second at 10% loss. What is his overall profit/loss?
The sum of two numbers is 24 and their product is 128. What are the numbers?
A 300-meter train crosses a platform in 30 seconds. If the speed of the train is 54 km/h, what is the length of the platform?
A person can complete a task in 12 days. Another person can complete it in 18 days. If they work together for some days and then the first person alone completes the remaining work in 5 days, for how many days did they work together?