Two workers A and B can complete a job in 8 days and 12 days respectively. A starts the work and after 2 days, B joins. In how many more days will the work be completed?
A3.6 days
B4.2 days
C4.8 days
D5 days
Correct Answer:
A. 3.6 days
Explanation:
Work by A in 2 days = 2/8 = 1/4. Remaining work = 3/4. Combined rate = 1/8 + 1/12 = 5/24. Time = (3/4)/(5/24) = 18/5 = 3.6 days.
A train travelling at 90 km/h takes 8 seconds to cross another train travelling at 54 km/h in the opposite direction. What is the sum of their lengths?
A200m
B280m
C320m
D400m
Correct Answer:
C. 320m
Explanation:
Relative speed = 90 + 54 = 144 km/h = 40 m/s. Distance = 40 × 8 = 320m = sum of lengths.
Two pipes A and B can fill a tank in 10 hours and 15 hours respectively. A third pipe C empties it in 20 hours. If all three are opened simultaneously, in how many hours will the tank be filled?