Q.191 Medium Technical Knowledge (NTPC)
If a train covers 540 km and takes 9 hours for the journey, and another train covers the same distance in 6 hours, what is the difference in their speeds?
A 30 km/h
B 45 km/h
C 60 km/h
D 90 km/h
Correct Answer:  A. 30 km/h
Explanation:

Speed of first train = 540/9 = 60 km/h; Speed of second train = 540/6 = 90 km/h; Difference = 90 - 60 = 30 km/h

Take Test
Q.192 Medium Technical Knowledge (NTPC)
What is the primary purpose of a pantograph in electric trains?
A To provide lighting
B To collect electricity from overhead wires
C To control train speed
D To apply brakes
Correct Answer:  B. To collect electricity from overhead wires
Explanation:

A pantograph is an apparatus that maintains contact with overhead electrical lines to collect power for electric trains.

Take Test
Q.193 Medium Technical Knowledge (NTPC)
What is the standard height of platforms at railway stations in India?
A 0.5 meters
B 0.75 meters
C 1 meter
D 1.25 meters
Correct Answer:  B. 0.75 meters
Explanation:

Standard platform height in Indian Railways is 0.75 meters (2.5 feet) for broad gauge to ensure safe passenger boarding.

Take Test
Q.194 Medium Technical Knowledge (NTPC)
What is the function of a turntable in a railway depot?
A To measure train weight
B To rotate locomotives for servicing and direction change
C To test brake systems
D To clean train engines
Correct Answer:  B. To rotate locomotives for servicing and direction change
Explanation:

A turntable is a rotating platform used in railway depots to turn locomotives around and position them for maintenance and service.

Take Test
Q.195 Medium Technical Knowledge (NTPC)
If the ratio of freight trains to passenger trains on a route is 3:5, and there are 45 passenger trains, how many freight trains are there?
A 25 trains
B 27 trains
C 30 trains
D 35 trains
Correct Answer:  B. 27 trains
Explanation:

If freight:passenger = 3:5 and passenger trains = 45, then freight trains = (3/5) × 45 = 27 trains

Take Test
Advertisement
Q.196 Medium Technical Knowledge (NTPC)
What is the minimum braking distance required for a train traveling at 100 km/h according to Indian Railways standards?
A 200 meters
B 300 meters
C 500 meters
D 1000 meters
Correct Answer:  C. 500 meters
Explanation:

Indian Railways specify a minimum braking distance of approximately 500 meters for trains traveling at 100 km/h under normal conditions.

Take Test
Q.197 Medium Technical Knowledge (NTPC)
What is the primary advantage of AC (alternating current) traction over DC (direct current) in electric trains?
A Lower initial cost
B Better efficiency and reduced weight of overhead equipment
C Easier maintenance
D Higher safety standards
Correct Answer:  B. Better efficiency and reduced weight of overhead equipment
Explanation:

AC traction systems are more efficient and require lighter overhead equipment compared to DC systems, making them economical for long-distance routes.

Take Test
Q.198 Medium Technical Knowledge (NTPC)
In the 2024 Indian Railways modernization, what is the primary objective of the 'Gati Shakti' program?
A To increase train speed exclusively
B To develop integrated transport infrastructure for faster movement of goods and passengers
C To reduce railway employee strength
D To eliminate all narrow gauge lines
Correct Answer:  B. To develop integrated transport infrastructure for faster movement of goods and passengers
Explanation:

Gati Shakti is a national master plan to develop integrated multimodal infrastructure for economic growth and faster movement of goods and passengers.

Take Test
Q.199 Medium Technical Knowledge (NTPC)
What is the standard distance between two consecutive railway stations classified as 'block sections'?
A 2-5 km
B 5-10 km
C 10-20 km
D 20-30 km
Correct Answer:  B. 5-10 km
Explanation:

Block sections in Indian Railways typically range from 5-10 km, which is the distance between consecutive signal posts for safety purposes.

Take Test
Q.200 Medium Technical Knowledge (NTPC)
Which of the following is NOT a function of a railway diesel locomotive's fuel injection system?
A To atomize diesel into fine particles
B To inject fuel at precise timing
C To regulate engine temperature
D To ensure proper combustion
Correct Answer:  C. To regulate engine temperature
Explanation:

Regulating engine temperature is the function of the cooling system, not the fuel injection system. The fuel injection system focuses on fuel atomization and precise timing.

Take Test
IGET
iget AI
Online · Ask anything about exams
Hi! 👋 I'm your iget AI assistant.

Ask me anything about exam prep, MCQ solutions, study tips, or strategies! 🎯
UPSC strategy SSC CGL syllabus Improve aptitude NEET Biology tips