Home Subjects Railway RRB / NTPC

Railway RRB / NTPC

NTPC, Group D, JE — all sections

132 Q 5 Topics Take Mock Test
Advertisement
Difficulty: All Easy Medium Hard 1–10 of 132
Topics in Railway RRB / NTPC
In a modern electric locomotive, what is the primary function of a pantograph?
A To collect electric current from the overhead catenary wire
B To store electrical energy in batteries
C To regulate air pressure in brakes
D To control the speed of the locomotive
Correct Answer:  A. To collect electric current from the overhead catenary wire
EXPLANATION

A pantograph is a mechanical device that maintains contact with the overhead electrical wire to supply power to electric locomotives and trains.

Test
Which of the following is the standard gauge used in Indian Railways?
A 1676 mm (Broad Gauge)
B 1000 mm (Meter Gauge)
C 762 mm (Narrow Gauge)
D 1435 mm (Standard Gauge)
Correct Answer:  A. 1676 mm (Broad Gauge)
EXPLANATION

Indian Railways primarily use 1676 mm broad gauge, which is the widest gauge in the world and allows for higher speeds and greater stability.

Test
In a diesel-electric locomotive, what is the primary function of the 'traction motor'?
A To generate electricity from the diesel engine
B To convert electrical energy into mechanical motion for driving wheels
C To compress air for brake systems
D To regulate fuel supply to the engine
Correct Answer:  B. To convert electrical energy into mechanical motion for driving wheels
EXPLANATION

The traction motor converts electrical energy into mechanical energy to drive the locomotive wheels through the transmission system.

Test
In railway signaling systems, what does a 'yellow signal' indicate?
A Stop immediately
B Proceed with caution, prepare to stop at the next signal
C Clear to proceed at full speed
D Speed restriction zone
Correct Answer:  B. Proceed with caution, prepare to stop at the next signal
EXPLANATION

A yellow signal indicates 'caution' - the driver should prepare to stop at the next signal as it may show 'stop' indication.

Test
What is the role of 'ballast' in railway track construction?
A To provide electrical conductivity
B To support the sleepers and distribute load evenly
C To prevent rust formation on rails
D To measure train speed
Correct Answer:  B. To support the sleepers and distribute load evenly
EXPLANATION

Ballast, typically made of crushed stone or gravel, supports the sleepers and distributes the train's weight evenly to the subgrade.

Test
Which component in a diesel locomotive is responsible for converting chemical energy into mechanical energy?
A Alternator
B Transmission system
C Diesel engine
D Traction motor
Correct Answer:  C. Diesel engine
EXPLANATION

The diesel engine is the primary component that converts the chemical energy stored in diesel fuel into mechanical energy through combustion.

Test
In railway terminology, what does 'rake' refer to?
A A tool used for track maintenance
B A complete set of coaches or wagons coupled together
C The slope of the railway track
D The angle between rails
Correct Answer:  B. A complete set of coaches or wagons coupled together
EXPLANATION

A 'rake' is a complete formation of railway coaches or wagons that are coupled together to form a train unit.

Test
Which of the following is the primary function of a buffer in railway couplings?
A To increase train speed
B To absorb shocks and reduce impact between coaches
C To facilitate uncoupling of trains
D To improve brake efficiency
Correct Answer:  B. To absorb shocks and reduce impact between coaches
EXPLANATION

Buffers are spring-loaded devices that absorb shocks and minimize damage during coupling and uncoupling of railway carriages.

Test
What is the gauge of the Indian railway network that covers the majority of the system?
A Broad gauge (1676 mm)
B Meter gauge (1000 mm)
C Narrow gauge (762 mm)
D Standard gauge (1435 mm)
Correct Answer:  A. Broad gauge (1676 mm)
EXPLANATION

Indian railways predominantly use broad gauge (1676 mm) which covers approximately 43,000 km of the total network.

Test
In railway signaling, what does a red signal indicate?
A Proceed with caution
B Stop - do not proceed
C Reduce speed
D Wait for further instructions
Correct Answer:  B. Stop - do not proceed
EXPLANATION

A red signal in railway signaling is a mandatory stop signal indicating that trains must not proceed beyond that point.

Test

About Railway RRB Practice on iGET

The Railway Recruitment Board (RRB) conducts multiple exams to fill thousands of vacancies in Indian Railways every year — including NTPC (Non-Technical Popular Categories), Group D (Track Maintainer, Helper, Assistant Pointsman), ALP (Assistant Loco Pilot), Junior Engineer, and Technician. Most exams have two CBT stages plus skill/document verification.

iGET's railway practice covers all common sections: Mathematics (arithmetic, percentage, ratio, time-speed-distance), General Intelligence & Reasoning (analogies, coding-decoding, syllogism), General Science (Physics, Chemistry, Biology — up to Class 10 NCERT level), and General Awareness (current affairs, history, geography, polity, economy).

Why prepare with iGET

Free access to thousands of railway-specific MCQs, mock tests matching the exact CBT pattern, negative marking simulation, NCERT-aligned science questions, and current affairs updated monthly. Topic-wise practice helps you identify and fix weak areas before the real exam.

Strategy tip

Railway exams are competitive — selection cutoffs are usually 70-80%. Mathematics and Reasoning together carry 75 marks out of 100 in NTPC CBT-1; mastering these two sections alone can secure your spot. Practice 100+ questions daily.

IGET
IGET AI
Online · Exam prep assistant
Hi! 👋 I'm your iget AI assistant.

Ask me anything about exam prep, MCQ solutions, study tips, or strategies! 🎯
UPSC strategy SSC CGL syllabus Improve aptitude NEET Biology tips